1312 W Canyon Lakes Dr, Kennewick Washington 99337
Last year (2018), Greg Senger Construction Inc. orchestrated and built our beautiful 6,896 square foot home (roof-foot-print) in the Tri-Cities, WA. in less than six months.Prior to construction, my wife and I interviewed six custom home builders located in the Tri-Cities and discussed our proposed floor plans & design amenities. We toured custom homes built by these builders and interviewed previous customers. We also researched Better Business Bureau, WA LLI, Banks, & Construction Suppliers to evaluate the builder’s reputation and timely payment of bills.Greg Senger became one of three finalists. We soon discovered Greg was most helpful (as compared to the others), in giving us advice on tweaking our design plans, setting us up to meet with his sub-contractors and coming up with final design & accessory options i.e. (Architect Firm, Excavating Contractor, Framer Contractor, Insulation Installers, Roofing Contractor, Electrical Contractor, HVAC Contractor, Plumbing Contractor, Sound System Contractor, Custom Cabinet Company, Dry Wall Installers, Mill Work Finish Carpenters, , Interior & Exterior Painter Contractor, Custom Floor & Tile Contractor, Garage Door Contractor, Cement Contractor, Exterior Stucco & Stone Veneer Contractor, exterior gutter contractor.The various suppliers Greg recommended aided us in selecting roof shingle design & colors, electrical light fixtures, can lights, dimmer switches, millwork & door designs, kitchen appliances, stucco color & texture, stone veneer materials & design, double-pane window brands and respective energy ratings, HVAC units, plumbing fixtures, floor compositions, cabinet counter-top options, tile back splash design options, rugs, hardware purchases, bathroom mirror design, etc.When construction began, we soon discovered how organized Greg Senger was in scheduling the various subcontractors working on our new home in an efficient manner. Greg basically made sure the various subcontractors were not in each other’s way by scheduling a time-line for each subcontractor to have either exclusive access to the house performing their construction and/or working in unison with the other contractors. Example: after the house was framed, he had the roofers on the roof, the plumbers under the house & on the subfloor and the HVAC installers in the attic. A week later the roofers, plumbers, HVAC installers were finished, he then had the team of (4) electricians inside the framed house installing electrical panels, wiring, can light fixtures, plug receptacles for next two weeks.The finished quality of work is outstanding! Over a year later, we are still thrilled with our new home and the quality of workmanship. All of our visitors have been impressed with the finished product.We thoroughly recommend Greg Senger Construction.Rick & Brenda Casqueiro