One of my technicians cut a 3/4” underground waterline 6” below the soil in gravel. My technician already had the line dug out for repair. All that was needed for the repair was a coupling and glue. The plumber had no travel time as he was a tenant in the building and I was billed $291 for a 10 minute repair. Lesson learned.Service: Plumbing pipe repair
One of my technicians cut a 3/4” underground waterline 6” below the soil in gravel. My technician already had the line dug out for repair. All that was needed for the repair was a coupling and glue. The plumber had no travel time as he was a tenant in the building and I was billed $291 for a 10 minute repair. Lesson learned.Service: Plumbing pipe repair