They were here around 7:30 am to get started on replacing six windows.They got them in and the metal siding back on by 9:45 am. The sills were vacuumed, and the windows were washed and caulked inside and out.They were packed up and on the road by 10:30 am.I couldn't be happier!
1313 IA-130, Tipton
They were here around 7:30 am to get started on replacing six windows.
They got them in and the metal siding back on by 9:45 am. The sills were vacuumed, and the windows were washed and caulked inside and out.
They were packed up and on the road by 10:30 am.
I couldn't be happier!